Add Mixes and Pours to a Concrete Batch Tracker

Set up mix codes and rates, schedule pours against them, and see what releasing or reverting a pour does to your delivery logs and tickets.

Written by Gabby Gutman

A mix is a concrete design you buy at an agreed rate. A pour is a scheduled delivery of one or more mixes. Set up the mixes first, then schedule pours against them.

Before you start

  • You need the Admin or Purchaser role by default. Your company can change this per role in Company Settings.

  • Create and save the tracker first. The mix and pour actions stay disabled until you do.

Add a mix

  1. Open the tracker and go to the Mix List tab.

  2. Click Add Mix.

  3. Enter the Mix Code, the Mix Description and the Cost per CY.

  4. Under Estimated Volume, enter the Estimated CY.

  5. Set a cost code, phase, vendor or notes if you use them.

  6. Save. The mix appears in the Mix List table.

Estimated CY is the takeoff volume, without waste. If the mix tracks waste, the Mix List shows it as Blended Waste % and Blended Waste CY, and Total CY is Estimated CY plus waste. Est. Cost is priced on Total CY at the all-in rate (cost per CY plus fees), so it will not equal Estimated CY times Cost per CY.

To change a mix later, open it from the same tab and use Edit Mix.

Add a pour

  1. Go to the Pour List tab.

  2. Click New Pour.

  3. Choose the mixes on this pour.

  4. Fill in the pour details and the planned cubic yards for each mix.

  5. Add any fees, and check the tax the tracker applies.

  6. Click Create Pour.

A new pour starts at Pending.

Pour statuses

A pour is either Pending or Released. You change it from the Status column on the Pour List tab: click the status, pick the other one, and confirm in the dialog.

  • Pending: scheduled, with nothing logged against it yet.

  • Released: confirmed with your supplier. Releasing creates 1 log entry per mix on the pour. You can still edit or delete the pour afterward.

Once the tracker has supplier invoices, the Pour List also shows an Invoice Status column, such as Not invoiced, Needs review, Ready to approve or Approved. It follows the invoices that bill the pour, not the pour itself. Approved means the invoice has been approved; it does not mean the pour is Released.

Reverting a released pour

Reverting a released pour to Pending removes the log entries that releasing created. The confirm dialog lists what applies to that pour:

  • Logged delivery tickets are unlinked from the pour and returned to Review Tickets.

  • Actual quantities entered on the Log are lost.

  • Notes, placement and pump edits made on the Log are lost.

  • Invoices attached to the pour, with nothing matched on them, are detached and need a pour selected again.

Re-releasing rebuilds the log entries from the plan. It does not bring back the actual quantities or the Log edits, and the tickets stay in Review Tickets until someone assigns them again.

When a pour cannot be reverted, Pending is greyed out in the list and hovering it tells you why. The usual reason is that the pour has been reconciled against an invoice. Unmatch the invoice lines first.

Notes and limits

  • A mix code must be unique within a tracker.

  • A pour code must also be unique within a tracker. Reusing one shows Pour code(s) already in use on this commitment with the code. The pour drawer stays open, so change the code and save again.

  • You cannot delete a mix that is used on a pour. Remove it from the pour first. The message names the pours using it.

  • A fee can apply to the entire pour or to separate mixes, not both, and only once per target. The pour form disables choices that would add it twice.

  • Deleting a mix or a pour asks you to confirm.

  • Your company can rename the Mix List column titles, so yours may not match the defaults shown here.

Best practices

  • To fix a quantity on a released pour, edit the pour. Do not revert it to Pending: that loses the actual quantities and Log edits, and every ticket on it has to be assigned again in Review Tickets.

  • Check the planned quantities before you release, not after. Reverting is the only way back to Pending, and it costs the Log work above.

  • Agree mix codes with your supplier before you enter them. A code must be unique within the tracker, and you cannot delete one that a pour is already using.