Use an asset request to borrow equipment from a warehouse and record who has it, so it can be checked back in when the work is done.
Before you start
You need the Create Asset Inventory Request permission to submit one, or Create Asset Draft Request to save a draft.
The equipment must already be in that warehouse's stock as an Asset, not a Consumable.
If the warehouse has projects linked to it, only those projects are offered on the form.
If your company has combined requests turned on, there is no Asset request tab. Assets go on a request on the Requests tab, and are checked out and in line by line.
Check an asset out
Open Inventory in the top navigation bar.
Go to the Asset request tab.
Choose the warehouse at the top left. Nothing else works until you do.
Click New request.
Enter a Request name and choose the Project. Both are required.
Choose the borrower under Borrower ID, or turn on For me.
Set a Requested date and a Return by date if you want them. Both are optional.
Search for each asset and enter the quantity.
Click Request to submit, or Save Draft to finish it later.
Check it back in
Open the request from the Asset request tab.
Click Check in items.
Tick each line that came back.
Enter the quantity under Returned.
If something is gone, tick Report lost and fill in Lost and Why.
Add the return paperwork under Paperwork, and any Notes for this trip.
Click Save.
You do not have to bring everything back at once. A line you leave unticked stays out, and you check it in the same way when it returns.
What happens next
A new request arrives at Unreviewed. Moving it to Checked out reserves the quantity against the stock item, so it shows as Committed rather than Available while it is out.
While it is out, the asset is listed on the On site tab under its project, with its Return by date. Once that date has passed it is marked Overdue.
Each check-in puts what you entered as returned back to Available straight away, and writes what you reported lost off the stock item. Every line shows Out / Returned / Lost, so you can see what is still on the job. Once nothing is out on any line, the request moves to Checked in on its own.
Merge requests
If 2 requests for the same project and warehouse should go out as 1, open the one to keep, click the 3-dot menu at the top, and choose Merge. The requests you merge in are cancelled, with a link to the one that now carries their lines. Merging needs Change Asset Request Status, and works only before Checked out.
Notes and limits
Check in items needs the Change Asset Request Status permission. Without it the button is greyed out.
Returned and Lost together cannot be more than what is still out on that line.
Reporting a loss needs a reason. The lost quantity is written off the stock item and does not come back to Available.
If your company has inventory costing turned on and charges lost assets to the job, a loss also charges the asset's purchase cost to the job and cost code it was out on.
You cannot move a request to Checked in from the status list while anything is still out. Check it in or report it lost first.
If your warehouse has its own status between Checked out and Checked in, the request does not close on its own. Move it on yourself once everything is back.
A request cannot skip a status. From Unreviewed it can go to Checked out or Rejected/Cancelled, and nowhere else.
Checked in and Rejected/Cancelled are both final. Nothing moves out of them.
Status names are set per warehouse, so yours may read differently from the ones here.
Cancelling and deleting
To release a request before the equipment leaves, move it to Rejected/Cancelled. The reserved quantity returns to Available. If part of the request was already checked in, only what is still out is released.
A request that is Checked out or Checked in cannot be deleted, because it is the record of who had the equipment. Deleting an earlier one removes it and its lines and notifies everyone watching.
Best practices
Report a shortfall as lost only when you know it is gone. A line left unticked stays out and can be checked in later, but a lost quantity is written off the item there and then, and putting it back takes a manual stock adjustment.
Check the asset in rather than cancelling the request once it is out. Cancelling frees the quantity but leaves no record that the equipment came back.
Put the borrower in Borrower ID rather than in the request name. It is its own column in the Asset request list, which is how the warehouse team finds who has what.
Set a Return by date on anything that has to come back by a set day. Without one the asset never shows as Overdue on the On site tab.