Return Items from a Job to Inventory

Put returned assets, yard consumables and PO material back into stock from a job, or check a return the field sent against the truck and confirm it.

Written by Gabby Gutman

When items come back from a job, record them here so they are back in stock. Return what the yard has in hand straight away, or confirm a return the job sent you once the truck arrives.

Before you start

  • Your company must have job returns turned on. Ask your Admin, or contact us.

  • You need the Return Stock permission. Your Admin sets it on the Permissions tab in Company Settings.

  • Confirming a return the job sent applies only when your company also has field returns turned on.

Return items you have in hand

  1. Open Inventory, then the On site tab.

  2. Choose 1 project in the project filter.

  3. Click Return to inventory.

  4. Tick each item that came back and set its quantity.

  5. If an asset is gone, set Lost and say what happened to it.

  6. Tick Send to quality hold on consumables that need inspecting.

  7. On PO material marked New to your warehouse, click Edit details to set where it goes.

  8. Click Return to inventory at the bottom of the drawer.

You can also open the same list from the + in the top navigation bar, then Log Return. It asks for the job first.

Confirm a return the job sent

  1. Open Inventory, then the Returns tab. It opens on Pending.

  2. Click Open on the return.

  3. Click Print sheet and check the truck against it.

  4. Under Received, enter what actually arrived on each line.

  5. If a different item came back, click Wrong item?, choose what came back, and click Swap.

  6. For something extra, click + Add an item that isn't listed, choose it, and click Add.

  7. Tick Quality hold on anything that needs inspecting.

  8. Click Confirm what arrived.

What happens next

A return you make from what you have in hand moves stock at once. Assets go back to their stock item and consumables go back to theirs. PO material lands on the warehouse's item for that material and unit, or on a new item if the warehouse has none. A lost asset is written off its stock item.

A return the job sent moves nothing until you click Confirm what arrived. Then the received quantities go into stock, the return shows as Confirmed, and the person who sent it is told what came back. Any line received short stays on the job, so an asset not received stays on the On site tab.

With field returns turned on, every return from a job gets a number such as RET-0012 and is listed on the Returns tab, including ones the yard makes itself.

Notes and limits

  • A return comes off 1 job. On the On site tab, Return to inventory stays greyed out until exactly 1 project is in the filter.

  • You cannot return more than the job still has out, and each item can appear only once.

  • Quantities going back to a yard request must be whole numbers.

  • PO material that was received into a warehouse is returned from its yard request, not from this list.

  • Only the yard can report a loss on a return. A pending return sent by the job cannot carry one.

  • If something on a pending return was removed from the job after it was sent, SubBase refuses the confirm. Set Received to 0 on that line, or swap it, and confirm again.

  • To drop a pending return without moving stock, click Cancel return. A confirm cannot be undone. To correct a count afterwards, use Add/Remove on the stock item.

Best practices

  • Change Received to what came off the truck before you confirm. It starts at the quantity sent on every line, so confirming without touching it returns everything as sent.

  • Use Wrong item? rather than setting a line to 0 and adding another. A swap tells the sender what was swapped for what; a 0 only reads as short.

  • Set Lost only when you know an asset is gone. The lost quantity is written off there and then, and putting it back takes a manual stock adjustment.

If this doesn't work

Start a chat from the Messenger in the bottom-left of this page, or email [email protected]. Include the order or project number and what you expected to happen.