Skip to main content

Route Material Requests to Fulfilling Teams

Send each material request line to the yard, safety or other team that handles it, by cost code, so every team sees only the requests that are theirs.

Written by Gabby Gutman

Fulfilling teams tell the people who handle material requests, such as your yard or your safety department, which request lines are theirs. Each line goes to the team that owns its cost code.

Before you start

  • Your company must have fulfilling teams turned on. Ask your Admin, or contact us.

  • You need permission to manage company settings to set teams up. Anyone can see and filter by team on requests.

  • Your cost codes should already be set up. A team is defined by the cost codes it owns.

Steps

  1. Open Company Settings, then the Orders tab.

  2. Open the Requests tab and find Fulfilling teams.

  3. Click Add team.

  4. Type the Team name.

  5. On the Members tab, add the people on the team.

  6. On the Cost codes tab, tick the cost codes the team handles.

  7. Click Save team.

  8. Under Lines with no matching cost code, pick the team that should get everything else, or leave it as No team.

What happens next

Each request line goes to the team that owns its cost code. If the line has no cost code of its own, the material's cost code is used. Anything no team owns goes to the team you picked for unmatched lines, or shows No team.

On the Requests list, the Team filter narrows the list to 1 team. Depending on your list layout, a Team column shows which teams each request touches, and team members get a My teams view. On a request, each line shows its team next to the cost code. Hover over it to see why the line went there.

Notes and limits

  • A cost code belongs to 1 team at a time. Codes another team already owns do not appear when you edit a team.

  • Teams only route lines. They do not change who approves a request or who can order it.

  • Deleting a team releases its cost codes. Lines that used them go to the unmatched-lines team, or show No team. The dialog says which before you confirm.

  • A team with no cost codes only gets lines if you choose it for unmatched lines.

Best practices

  • Pick a team for Lines with no matching cost code. Otherwise lines with a missing or new cost code show No team and nobody sees them in My teams.

  • Put the cost code on the material in your Material Database. A line without its own code falls back to the material's, so the request still reaches the right team when the requester leaves the code blank.

If this doesn't work

Start a chat from the Messenger in the bottom-left of this page, or email [email protected]. Include the order or project number and what you expected to happen.